Project
Elodie Plough Recovery
- SECTOR: Interconnector
Project Overview
Project Info
- Date October 2014
- Site Elodie Plough Recovery
- Vessel Kingdom of Fife
- Operations Controlled Flow Excavation, Salvage and Cargo Recovery
- UTROV® Tooling Used Controlled Flow Excavator, Pincer Grab, Bespoke Two-Wire Grab
Utility ROV Services were contracted by Briggs Marine to recover a cable plough from the seabed in The Little Minch between the islands of Skye and South Uist.
In 14 days, Utility ROV developed a concept, performed detailed engineering, built and tested a bespoke grab to be integrated with the UTROV® and mobilised for the recovery of the plough.