Project

Elodie Plough Recovery

  • SECTOR: Interconnector

Project Overview

Project Info

  • Date October 2014
  • Site Elodie Plough Recovery
  • Vessel Kingdom of Fife
  • Operations Controlled Flow Excavation, Salvage and Cargo Recovery
  • UTROV® Tooling Used Controlled Flow Excavator, Pincer Grab, Bespoke Two-Wire Grab

Utility ROV Services were contracted by Briggs Marine to recover a cable plough from the seabed in The Little Minch between the islands of Skye and South Uist.

In 14 days, Utility ROV developed a concept, performed detailed engineering, built and tested a bespoke grab to be integrated with the UTROV® and mobilised for the recovery of the plough.